Installation of most ERWEKA equipment is easy to and can be by the user himself or an engineer of the company (TAR, SVM, ZT 220/320, TBH 125/325/425/525/D/TD/WTD, DT 820/720/620 etc.)
For more sophisticated products such as dissolution systems ERWEKA offers complete tubing kits and even pre-configuration. The user or the engineer only has to connect the tubing and plug the numbered interface cable in the equivalent numbered sockets.
For a perfect installation and training of the user/s, ERWEKA opionally offers a complete installation service by an ERWEKA engineer. This means the unit or system will be installed at your site, the operation will be checked and the user/s receive a training in the operation of the unit and (when needed) software.